Project: Minnesota Reservoir
Minnesota Reservoir - 70 Years of History
June 09, 2017


Large Reservoir Small Reservoir

In September of 2016, Nob Hill Water applied for a low interest Drinking Water State Revolving Fund loan to demolish the two existing reservoirs and rebuild one larger reservoir. In January of 2017, we were notified by the Department of Health (DOH) that our application was selected to receive funding! DOH had $35 million available this cycle for construction projects and they received requests for $58 million.
Since January, staff and our engineers (RH2 Engineering) have been busy with design elements of the new reservoir. The new reservoir will be a larger, completely above ground, Prestressed Concrete Tank. This allows a better visual inspection of the reservoir. Additionally, the new reservoir will be six feet taller than the existing one.
Construction timing is very important since it is necessary to demolish the existing reservoirs before rebuilding. Due to these time constraints, it is still be analyzed whether construction will begin in the Fall of 2017 or the Fall of 2018.
~ Stay Tuned ~
If any questions regarding the Minnesota Reservoir project, please email Kirsten at engineeringtech@nobhillwater.org.